Example mockup: the scheduling board of Tolvane Métal, a fictional sheet metal works. Schedule for Thursday 10 September, morning shift from 06:00 to 14:00, six machines: two lasers, two press brakes, one welding bay and one deburring bench. Of 48 hours of capacity, 43.1 hours are committed, including 3.7 hours of changeover, and 4.9 hours are still free, that is 90% load. On the left, five works orders are waiting for a slot, 12.6 hours of work in total. Below, the CNC log and the throughput of each station, with the bottleneck at welding, 14 pieces per hour.
METALWORK & SHEET METAL
Production scheduled station by station, with no surprise bottleneck.
Scheduling per workstation, work orders, conformity rate and true cost of goods. Connected to your time clocks and your ERP.
PRE-GENERATED DEMO FOR THIS INDUSTRY
WHAT YOU GET
Three benefits, decided with your teams.
A schedule per workstation, not per gut feeling
Work orders are placed on each station according to real load; conflicts show up before they cost you a day.
Bottlenecks caught, deliveries kept
The AI agent spots the saturated station, proposes a reschedule and checks that the date promised to the customer still holds.
True cost per production run
Clocked hours, consumed materials and scrap roll up automatically: you know the margin of every run, not an estimate.
We do not turn up with a ready-made template. An architect first comes to watch how you actually work, picks up your vocabulary and maps your real process: the screens above are a starting point, not an answer.
How we learn your tradeProduction management softwareIts mockup, generated in minutes.
100% free mockup · Collaborative development · Custom pricing set by your expert