Example mock-up: the site logbook of Rocheval BTP, a fictional construction company. Five site cards — Les Tilleuls apartments 68%, Chalmeyrac primary school 41%, Sarnac warehouse 86%, Bel-Air car park 54%, Vaudreil sports hall 23% — each with a thumbnail of the works, the progress ring, the site manager, the weather logged on site that morning and the next two milestones. Below, payment application no. 7 for Les Tilleuls: seven packages, €1,600,000 of contract value, €1,095,510 applied to date (68%), and €504,490 left to invoice.
EXAMPLE BUILDS
Eight industries, bespoke software for each of them.
Bakery chain, metalwork, sawmill, advertising sales house, construction, clinic, haulage, technology: eight complete builds, each with its own brand, screens and the vocabulary of its trade.
The eight companies shown are fictional: they are example mockups built for this demo, not Ghost customers.
- Example
Construction site tracking
Mobile time tracking, timestamped photos, change orders, sign-off reports and margin recalculated continuously. Linked to your accounting and suppliers.
Example: Rocheval BTP, a fictional company.
See the demo - Example
Example mockup: the bakehouse station of Maison Malestre, a fictional bakery chain. Workshop tablet for the Bègles bakehouse at 6:52 am. The timeline of the day lays out the three morning batches — 300 Malestre baguettes in oven 1, 240 Tradition 400 g in oven 3, 90 one-kilo country loaves in oven 1, that is 630 pieces and 301 kg of dough — each broken into mixing, bulk proof, bake and cooling, with the quantity and the oven alongside. Below, the three round departures: 7:10 am van 1 to four shops, 9:40 am van 2 to three shops, 12:20 pm van 3 to two shops, for nine shops and 42 crates; van 1 is 73% loaded, eleven crates of fifteen.
Proving room 224.1 °COven 3 · deck248 °CBatch 2 · bulk proof1 h 28 leftT65 flour · silo 1410 kgMixing water12 °CLiquid levainpH 3.9Bakehouse and delivery round software
Batches planned shop by shop, delivery rounds resequenced every morning, ingredients and unsold stock tracked to the gram. Linked to the tills in your shops.
Example: Maison Malestre, a fictional company.
See the demo - Example
Example mockup: the scheduling board of Tolvane Métal, a fictional sheet metal works. Schedule for Thursday 10 September, morning shift from 06:00 to 14:00, six machines: two lasers, two press brakes, one welding bay and one deburring bench. Of 48 hours of capacity, 43.1 hours are committed, including 3.7 hours of changeover, and 4.9 hours are still free, that is 90% load. On the left, five works orders are waiting for a slot, 12.6 hours of work in total. Below, the CNC log and the throughput of each station, with the bottleneck at welding, 14 pieces per hour.
Queue5WO-2439 · Orvenn304 stainless · 2.0 mm · 60 pcs · 2.4 hDue 12 SepWO-2441 · Rocheval BTPDC01 steel · 3.0 mm · 24 pcs · 3.1 hDue 15 SepWO-2443 · Clinique Valmore5754 aluminium · 1.5 mm · 120 pcs · 2.8 hDue 18 SepLaser 1100% committedLaser 21 h free at 13:00PLI-02back gauge to fixWO-240242 min rework304 stainless · 2.0 mm12 sheetsLoad today90%Production management software
Scheduling per workstation, work orders, conformity rate and true cost of goods. Connected to your time clocks and your ERP.
Example: Tolvane Métal, a fictional company.
See the demo - Example
Example mock-up: the software of Scierie Ambrel, a fictional sawmill. Week 35 material flow at the Vaux-sur-Ambre site: 1,250 m³ of logs fed to the saw, 775 m³ of sawn timber off the line — a 62% recovery rate — and 475 m³ of by-products; 505 m³ go into the kilns, 270 m³ ship green, and 760 m³ enter finished stock. Below the diagram, the four species in the yard: oak 186 m³ at 12% moisture, beech 142 m³ at 9%, Douglas fir 415 m³ at 18% and spruce 437 m³ at 22%, for 1,180 m³ available.
Log truck B-118 unloaded in the yard62 m³Kiln 4, conditioning step41 °CBand saw 3 sharpened12 minDelivery note 2418 loaded for Beaune24 m³Chips sent out to the boiler house235 m³Log yard, sawing and kiln software
Log intake, output per species, drying kilns and finished-goods stock, from the yard to delivery. Linked to your weighbridge and your invoicing.
Example: Scierie Ambrel, a fictional company.
See the demo - Example
Example mock-up: the software of Médiavelle, a fictional advertising sales house. Media plan for the South-West sector from week 36 — seven display faces as rows, 6 weeks as columns; every cell is sold, on option or free, the advertiser's name runs across the weeks it holds and the sold rate sits under each column. On the right, the selected face “Gare Nord — quai A”: backlit 2 m² bus shelter, 175 × 118 cm, 32,400 contacts a day, €1,240 a week, sold nine weeks out of twelve, and its next three campaigns — Malestre on air, Valmore approved, Orvenn still on option.
Posting W366 facesArtwork inValmoreOption expires FridayOrvennSpot aired 7:42Vox 7-9amQuote signedRochevalInvoice issued€2,480Advertising sales house software
Campaigns per advertiser, inventory of sites, display schedule and monthly invoicing. Synced with your advertisers and your accounting.
Example: Médiavelle, a fictional company.
See the demo - Example
Example mock-up: the day schedule of Clinique Valmore, a fictional multi-specialty clinic, Friday 4 September. On the left, the live waiting list: five people present, waiting between 5 and 21 minutes, 12 minutes on average. On the right, the day's schedule, one column per practitioner — general practice, orthopaedics, imaging, physiotherapy, dermatology and midwifery — hours down the side, and for each appointment the procedure, the room and its state: completed, in progress, patient arrived or expected. Unavailable rooms — imaging sensor maintenance, theatre disinfection, cleaning, lunch — are hatched. Patients carry an invented first name and an initial; no medical reason is attached to them.
AgentThe 11:00 slot freed on Dr Roussel's list was offered to the waiting list: three patients notified, one confirmation expected before 10:45 — the morning stays gap-free.Appointment and room management software
Schedule per practitioner, room occupancy, patient journey and automatic reminders. Linked to your calendars and your invoicing.
Example: Clinique Valmore, a fictional company.
See the demo - Example
Example mock-up: the control tower of Transports Marnoy, a fictional haulier. On the left, the plan of round N2 towards northern Mâcon: six stops, three delivered, one exception at Davayé and two still to go, with the vehicle moving along the line; 14 stops delivered out of 19, next stop Sancé in the 14:40 to 15:10 window. On the right, the list of vehicles on the road, each with its driver, its round, its stops delivered out of stops planned and its status: on time, ahead, late or consignee absent; 77 stops delivered out of 125, 48 to go, two vehicles running late and one held up. Along the bottom, a continuous event band: signed deliveries, confirmed collections, absent consignees, claims opened and traffic on the A6.
Delivery signed · Prissé14:31Collection confirmed · Verzé3 palletsConsignee absent · Davayésecond attempt tomorrowClaim opened · damaged parcelLT-2417Traffic on the A6 · junction 27+14 minBack at the dock · round R714:28Backup assigned · 6 stops taken overS4 to M1Appointment confirmed · Tournus16:00 – 18:00Transport planning software
Rounds, vehicle tracking, load factor, incidents and transport documents. Linked to your telematics and your invoicing.
Example: Transports Marnoy, a fictional company.
See the demo - Example
Example mock-up: the data-flow console of Orvenn, a fictional industrial data platform vendor. Dark-themed screen, icon rail and terminal. The graph of the atelier-nord pipeline links ingestion (42 streams, 4.1k points per second), validation (schema v14), transformation (38 models), the warehouse (74,000 rows) and the API (310 requests per second, 84 ms p95), with a quarantine branch taking 4,960 rejected points, or 0.4% of the volume. Below the graph: throughput and lag for the five stages for an end-to-end freshness of 12 seconds, ingestion throughput over the last six windows, the timestamped log of run #4821 (05:00 to 05:05, 2 min 41 s, 1.24M points, one presse-3 stream outage recovered in three seconds) and the last four runs.
Projects, tickets and service-level software
Time spent per assignment, service-level commitments, project portfolio and usage-based invoicing. Linked to your ticketing tool and your accounting.
Example: Orvenn, a fictional company.
See the demo